Full bathroom renovation
A bathroom taken back to the studs and rebuilt, typically three to five weeks, with the permit and code points that decide the sequence.
Services
Grab bars into real blocking, a curbless or low-curb entry and a layout that works with a walker, done once and properly.
Most accessibility work in bathrooms is done twice: once badly and in a hurry after somebody comes home from hospital, and then again properly. Done at the right time it is not expensive, and a lot of it is invisible.
Step one: grab bars, and the blocking behind them. A grab bar is only as good as what it is screwed into. A bar fixed to drywall with plastic anchors will come off the wall with a person's weight on it, and drywall toggles are not a substitute for solid backing. The correct approach is blocking: 19 millimetre plywood or solid lumber fixed between the studs while the wall is open, so a bar can be fitted anywhere along that run later. If you are renovating a bathroom at any age, put blocking in around the toilet and in the shower even if you are fitting no bars now. It adds perhaps $200 to the job and makes the next change trivial.
Step two: the entry. A curbless shower is the best answer for anyone using a walker or a wheeled shower chair, and it requires the finished shower floor to sit below the bathroom floor, which usually means recessing the structure or raising the room. On a second storey that is structural work. A low 50 millimetre curb with a bevelled threshold is a good compromise for someone who walks but is unsteady. A 40 millimetre step over a tub wall is not an accessible entry at any age, which is why tub-to-shower conversion is usually the first move.
Step three: door width and turning space. The doorway is the constraint people forget. A standard older Ottawa bathroom door is often 610 or 660 millimetres wide, and a walker generally needs 810 millimetres to pass comfortably. Widening a doorway means reframing, which is permit work when a wall is altered (City of Ottawa, Do I need a building permit). A swing-clear hinge or a barn-style sliding door can recover 50 to 75 millimetres of usable width without structural work, which is sometimes enough. Inside the room, the aim is a clear circle of about 1.5 metres for a wheelchair, which in a 4.5 square metre bathroom usually means a wall-hung basin rather than a vanity.
Step four: fixtures and controls. A comfort-height toilet at roughly 430 to 480 millimetres to the seat rather than the standard 380 to 400 makes standing much easier. Lever handles rather than knobs. A thermostatic or pressure-balancing mixing valve, because scald risk is higher for someone with reduced sensation or slower reactions, and a hand shower on a slide bar so it can be used seated. A fold-down shower seat fixed into blocking, not suction-mounted.
Step five: lighting and floors. Older eyes need considerably more light than the single ceiling fixture most Ottawa bathrooms were built with, and shadowless light at the mirror matters for shaving and medication. Floor tile should be specified for wet slip resistance rather than chosen only on looks, and smaller format tile with more grout lines gives better grip than a large polished porcelain slab.
How long it takes. Grab bars into existing blocking, half a day. A full accessible renovation of a standard bathroom, three to five weeks, which is a normal bathroom schedule. Widening a doorway adds several days and the permit process.
What it costs in Ottawa in 2026. Indicative. Grab bars properly fitted into existing blocking or studs, $150 to $400 each including labour. Adding blocking during an open-wall renovation, $200 to $500 for the whole room. A comfort-height toilet fitted, $600 to $1,200. A thermostatic valve and hand shower on a slide bar, $900 to $2,000. A tub-to-shower conversion with a low curb, $12,000 to $22,000. A curbless shower with floor structure modified, $18,000 to $35,000. Widening a doorway, $1,500 to $4,000 depending on what is in the wall.
What makes an Ottawa house different. Two things, both about housing stock. The 1950s and 1960s bungalows across Alta Vista, Elmvale, Carlington and older Nepean are genuinely good candidates for ageing in place, because the bathroom is on the entry level and there is often room to work with, but they come with 610 millimetre doors, small windows and original steel tubs set in mortar. The 1990s and later two-storeys across Barrhaven, Kanata and Orléans have the opposite problem: generous bathrooms, but all of them upstairs, with at best a powder room on the main floor. Converting that powder room into a full accessible bathroom is often a better project than adapting the ensuite, and it needs the drainage checked early.
Who should do the work, and what to ask. Plumbing changes belong to a certified plumber, since plumber is a compulsory trade in Ontario under code 306A (Skilled Trades Ontario, Plumber, trade code 306A), and electrical work for hire to a Licensed Electrical Contractor (Electrical Safety Authority, Notifications and inspections). There is no accessibility licence for contractors in Ontario, so the useful credential is experience: an occupational therapist's assessment, where one is involved, is worth more than any contractor's opinion about what a particular person needs. Ask: what is behind the wall where the bar is going. Are you adding blocking while it is open. What is the finished threshold height. What is the clear door opening, in millimetres, after the work. Is the mixing valve thermostatic. Has an occupational therapist looked at this.
A bathroom taken back to the studs and rebuilt, typically three to five weeks, with the permit and code points that decide the sequence.
Replacing a tub with a walk-in or curbless shower, usually one to two weeks, with the drain and framing questions that decide feasibility.
The membrane, pan and flood test that decide whether a shower lasts twenty years or leaks into the ceiling below in year three.
Adding a bathroom below the sewer line, with the pump or break-up options, the permit, and the Ottawa flooding question.
Grab bars into real blocking, a curbless or low-curb entry and a layout that works with a walker, done once and properly.